1/6/2009


Final Tender Protocol

The proposed rules and procedures for Brasil Round 7 are available in the Final Tender Protocol. This round it is divided into parts A and B. The first one refers to the exploratory blocks and the second one refers to the marginal fields.

The Concession Agreement is part of the Final Tender Protocol.

The Final Tender Protocol and the Concession Agreement are available for download in Word format. (Portuguese version)


Final Tender Protocol

» General Information

» Part A

» Part B


Concession Agreement


» Part A

» Part B



IWP Spreadsheets
Instructions to fill the
Initial Work Program Spreadsheets in Portuguese:


Instructions


Spreadsheets to calculate the IWP:

Araçás Leste
Rio Una
Bom Lugar
Jacarandá
Fazenda São Paulo
Pitanga
Gamboa
Jiribatuba
Morro do Barro
Sempre Viva
Curral de Fora
Cidade de Aracaju
Alagamar
Foz do Vaza Barris
Tigre
Carapitanga
Cidade de Pirambu

Local Content

Download an excel spreadsheet to calculate the Local Content to be offered for the blocks located at:

Shallow waters: 0-100 m

Shallow waters:
100-400m


Deep waters

Onshore


Annexes

View the annexes of the Final Tender Protocol in word format.

Annexes - Part A

Annexes - Part B (Portuguese)



© 2005 - Agência Nacional do Petróleo, Gás Natural e Biocombustíveis